News

List of Hammerhead Day Projects

 

1. Enclose 1 end of Laughing eyes pavilion

2. fix holes in sheetrock Dhall

3. put on new knobs and pulls Dhall cabinets

4. Caulk outside wall of Fireplace Goetz Lodge

5. Install sink and paint Maryville showerhouse

6. paint trim Maryville lodge

7. put up wall backside of Maryville near garage doors

8. Paint Training center doors green

9. replace window blinds in cabins that need it

10. install handrail basement of Campmaster

11. Caulk Pool

12. paint pool entryway

13. paint chemical room door

14. treat porch at pool cabin

15. build soffet for back of Boat house

16. fix washouts side of Herzog Lodge

17. treat back wall of council ring backdrop

18. treat inside wall COPE Pavillion

19. Put up Pavillion in Short Arrow

20. Repair picnic tables

21. build folding benches

22. repair platforms in campsites, Strong Bull

23. Projects of Shotgun Range.

24. Treat Tower

25. repair gutter Training Center

26. Gates at 5 stand needing repair

27.Insulate Campmaster ceiling and Ranger’s House

28. Repair Benches at Dhall

29. Attach Stainless Steel archway in Dishroom Dhall

30. Build landing on steps off loading Dock.

alternative text
alternative text
alternative text
alternative text

This site may appear to be very slow when using older versions of Internet Explorer.

You may see a substantial performance boost by using one of the other popular free browsers.

You may want to download
Google Chrome Here 
or 
Mozilla Firefox Here.